Test DCB LAG to confirm path fail over
We need to double check the path fail over on the TIC-DCB LAG to confirm that we can survive one leg of the path going down. This will ensure that we don't see any interruptions when the fiber infrastructure is moved away from RUST.
We can check this after hours by shutting down one link at a time on the TIC side.